1st Floor Refurbishment, John Lewis Liverpool

Client: ISG
Location: Liverpool
Value: £440,000
Programme: 26 Weeks 24/7

Mechanical and electrical installation project to undertake the refurbishment of John Lewis Liverpool’s first floor beauty department, including associated department relocations and the introduction of a third party catering concession.

Electrical installation:

LED lighting installation including energy saving calculations
Emergency lighting
Feature pendant lighting
Small power
Data
Fire alarm
Public address
Security
CCTV
Access control
BMS alterations
Mechanical wiring

Mechanical installation:

Alterations and installation of the ventilation system
Hot and cold water services
Drainage and air conditioning systems
Building management systems

Sprinkler installation:

Alterations to the existing sprinkler systems to suit the revised store layout