Location: Hounslow
Contract Value: £1,400,000
Programme: 52 weeks
Our electrical scope of works involved liaising with UKPN on the installation of a new 2MVA Midel DYN11 unit transformer system, including transformer mounted
250A MV isolator/VT connection and 3200A 4P ACB. We, MJ Electrical then undertook the supply & install of a new Main switch LV panel, including the incoming cabling & metering from the upgraded UKPN supply. The new main LV switch panel which included micro-logic switching and sub-metering with built in remote access for external monitoring.
Throughout the building we supplied & installed a total of 30no 3-Phase sub-distribution boards which distributed power supplies to large industrial cooking appliances / mechanical plant such as AHUs, FCUs, Blast Chillers Refrigeration Units etc. New earthing and bonding, including new earthing network to UKPN specification installed. All new LED lighting installed at high- and low-level areas suitable for various types of environments. General power installed for office use equipment, low voltage kitchen applications & general use equipment for the public. New ELV and LV containment systems installed. New L1 category fire alarm system installed with various smoke / heat & aspirating devices to suit various temperature environments. New IT / Data Cat 6 system installed. New security, CCTV, Intruder alarm, Access control system installed.
Electrical Installation:
Incoming mains supply coordination with the local supply authorities
Main switch gear and metering
Sub main cabling and distribution equipment
UPS and Standby generator equipment
Lighting Design
Lighting, emergency lighting and lighting control systems
Small power
Telecoms and data services
Fire alarm and fire suppression systems
Security, access control and CCTV systems
Lightning protection
Auto Door Installation
Disabled Call Systems