Location: Kent
Contract Value: £500,000
Programme: 9 weeks (accelerated from programme from 18 weeks)
The project was extremely challenging as we had to work to an accelerated 9 week programme to meet the client’s requirements, which involved working 24/7 in a live hospital environment.
The project was delivered successfully in an extremely short space of time and provided the clients with a purpose built ED/PAU combined children’s area, which is light, bright, spacious and fully functional.
Electrical Installation:
Main switch gear and metering
Sub main cabling and distribution equipment
UPS and Standby generator equipment
Lighting Design
Lighting, emergency lighting and lighting control systems
Small power
Telecoms and data services
Fire alarm and fire suppression systems
Security, access control and CCTV systems
Public Address systems
Auto Door Installation
Disabled Call Systems
Nurse Call Systems