Location: London Colney, St Albans
Contract Value: £345,000
Programme: 24 weeks
Summerfield Health Centre was created to become part of an integrated hub of core community services to the town. A Community Centre and Library were both part of the overall original site and these amenities remained in full use during the construction of the medical centre along with the car parking facilities.
This project involved liaising with UKPN on the install of a new 117KVA – 415V building supply fed from a new transformer. With environmental sustainability a key element of the project, a new PV solar panel system was installed, as well as new internal LED lighting with emergency integration system installed with control via presence detectors in corridors and local switching within the office and theatre rooms to allow for energy saving. New external wall and car park lighting with smart built in day light sensors and presence detection was also installed as well as EV chargers for staff and visitor vehicle parking. These conscious eco-friendly installations enable the building to service the community with minimal environmental impact and ensures sustainably for many years to come.
Electrical Installation:
Incoming mains supply coordination with the local supply authorities
Main switch gear and metering
Sub main cabling and distribution equipment
Lighting Design
Lighting, emergency lighting and lighting control systems
Small power
Telecoms and data services
Fire alarm and fire suppression systems
Security, access control and CCTV systems
Lightning protection
Auto Door Installation
Disabled Call Systems
Nurse Call Systems
EMS